
Kitchen demolition / Greater Seattle
Kitchen demolition in Greater Seattle
For kitchen demolition, look no further than BRD. We remove cabinets, countertops, backsplash, flooring, and soffits cleanly so your remodel starts on schedule.
Residential / Commercial / Site protection
Get a free estimateThe short answer
What does kitchen demolition include?
Kitchen demolition is the removal of cabinets, countertops, backsplash tile, appliances, flooring, soffits, and wall finishes so a kitchen can be rebuilt. BRD Demolition handles kitchen demolition for homeowners and remodeling contractors across Greater Seattle, including dust containment, floor protection, and hauling the debris away. Most kitchens take a few hours to a few days depending on size and how much is coming out.
- Commonly removed
- Cabinets, countertops, backsplash, flooring, soffits, drywall, appliances
- Typical duration
- A few hours to a few days
- Left for other trades
- Final plumbing, gas, and electrical disconnects and all new installation
- Debris
- Loaded and hauled off site by BRD Demolition
- Service area
- Greater Seattle, including King and Snohomish counties
- Estimate
- Free, written after an on-site walkthrough

Before we start / 01
How weget yourkitchenready.
A kitchen packs water, gas, power, and ventilation into one room. Before we pull anything, we shut off the water at the fixture and confirm the range and dishwasher circuits are dead, and any gas appliances are capped by the right trade. Then we seal the room off from the rest of your house.
See what is includedShut off / Seal / Remove
If this sounds familiar
Is thisyourkitchen?
These are the situations we get called about most often.
A common mistake we see is pulling the cabinets before deciding what happens to the floor. In many Seattle-area homes, the cabinets sit directly on the subfloor and the finished flooring runs up to the toe kick. Removing them leaves a footprint you will have to deal with either way.
- Your contractor or cabinet installer needs an empty room by a set date.
- You want to keep part of the kitchen, such as the uppers or the hardwood, and replace the rest.
- A dishwasher or sink leak has damaged the cabinet bases and subfloor.
- A soffit or peninsula is blocking the layout you want.
- You started the tear-out yourself and it is bigger than expected.
What is included / 02
What’sincluded.
Whether it is removing countertops or taking the room down to the studs, our team is equipped to handle all of it.
Countertops and backsplash.
We release stone, solid surface, laminate, and tile tops and carry them out in manageable sections. When the wall is being rebuilt, the backsplash tile comes off with the material behind it.
Cabinets and soffits.
The uppers come down first, then the bases. We open soffits carefully because they often hide ducting, wiring, or plumbing vents that need to be rerouted by the appropriate trade.
Flooring and underlayment.
When your plan calls for it, we remove tile, sheet vinyl, laminate, and hardwood down to the subfloor. That includes the staples, thinset, and underlayment your next installer does not want to find.
Walls and ceilings.
We remove drywall or plaster where your plumbing and electrical rough-in will change, and leave the studs clean and nail-free for the next trade.
Capping gas lines and permanent plumbing or electrical changes are done by licensed trades, and we coordinate our work around them.
How we work / 03
What youcan expect.
We do full kitchen guts and careful partial removals.
Some kitchens go back to bare studs and subfloor. Others only lose the countertops so new stone can go on the existing cabinet boxes. We do both, and the method is different. Selective work means cutting the caulk lines, releasing fasteners from inside the boxes, and protecting everything that is staying.
If your cabinets are in good shape and you plan to donate or reuse them, tell us at the walkthrough. Taking them out intact takes longer than breaking them down, and we plan the job accordingly.
Our process
How itworks.
Here is what you can expect when we demo your kitchen.
Protect and contain.
We lay floor protection along the route out, seal the kitchen with plastic and a zipper door, and cover the vents.
Disconnect and clear.
We shut off the water at the stops, disconnect the appliances and move them out, and verify the circuits are off.
Tops, then boxes.
The countertops and backsplash come off first, followed by the upper cabinets, base cabinets, and soffits.
Floor, walls, ceiling.
We remove the flooring, underlayment, and any wall or ceiling finishes we agreed on, and de-nail the framing.
Haul and sweep.
We load the debris as we go, sweep the room, and walk it with you or your contractor before we leave.
Your options
Full gutor partialtear-out?
The right answer depends on what is changing behind your walls.
If your layout, plumbing, and wiring are staying where they are, a partial tear-out of the cabinets and countertops is usually enough. Once the sink, range, or island is moving, taking the room to the studs is normally cheaper overall, because your plumber and electrician can work in open walls.
Another common mistake is ordering cabinets before demolition. Measurements taken off bare studs and subfloor are more reliable, and sometimes a soffit or bulkhead cannot be removed once you see what is inside it.
- Keep the cabinet boxes: countertop and backsplash removal only
- New layout: full gut to studs and subfloor
- Tile floor running under cabinets: remove it before new cabinets go in
- Soffits: open one first to see what is inside before planning tall uppers
Keep what stays / 01
Carefulpartialremovals.
When your cabinet boxes are staying and only the tops are going, the work is all about releasing adhesive and fasteners without racking the boxes or chipping the face frames. We put covers on the cabinets before we start.

Ready for rough-in / 02
Readyfor yourplumber andelectrician.
Plumbers and electricians work faster in a room with bare, de-nailed studs and a swept subfloor. That is how we aim to leave your kitchen, so your next trade can start the morning after we finish.

In King and Snohomish counties
Kitchendemolitionin GreaterSeattle.
What we find in a kitchen depends a lot on when the house was built.
Mid-century ramblers and split-levels across the Eastside and north Seattle often have soffits over the cabinets, sheet vinyl layered over older flooring, and site-built cabinets nailed to the framing. All of that takes longer to remove than a modern modular kitchen.
We find a lot of dishwasher and sink-base leaks, and in our damp climate a slow leak can soften the subfloor well beyond the cabinet. Older sheet flooring and its adhesive are also on the asbestos survey list, which the Puget Sound Clean Air Agency requires before removal.
Why it matters
What arushedtear-outcosts you.
Kitchen demolition looks simple until something behind the wall gets hit.
A supply line nicked behind a base cabinet or a drain cut flush in a soffit will flood a subfloor in minutes. A live circuit left in a wall that is being opened is a shock and fire risk. We shut everything off and open hidden cavities by hand first, which is what prevents both.
Leaving old underlayment, thinset ridges, or fasteners sticking up causes problems that show up later as uneven tile and squeaks under your new flooring. For us, demolition is finished when the surfaces are ready to build on, not when the cabinets are gone.
Pricing guidance
What kitchendemolitioncosts.
Every job is quoted after a walkthrough, and the estimate is free.
We price kitchen demolition by the work involved, not at a flat rate. Here is what affects your price:
- Kitchen size and the number of cabinets
- Countertop material, since stone is heavier and slower than laminate
- Whether flooring, soffits, walls, or ceilings are included
- Layers of old flooring and how they were fastened
- Access: stairs, distance to the driveway, and parking
- Selective removal or salvage versus full tear-out
What customers say
5.0 on Google
from 62 reviews.
Rating and review count as shown on BRD Demolition’s Google Business Profile, November 2026.
Read every review on Google“Everything protected well and left very clean!”
Kirsten D.Demolition project / Google review
“They kept the job site and the rest of our house super clean.”
Brenn G.Bathroom remodel / Google review
“They did a chimney demolition for me and made it look easy.”
Reuben C.Chimney demolition / Google review
Frequently asked questions
Questionsand answers.
Can you move appliances out of the way?
Yes. Standard appliances are disconnected and moved out of the kitchen or to a location you choose so the tear-out can proceed.
How long does kitchen demolition take?
BRD Demolition completes most kitchen demolition jobs in the Greater Seattle area in a few hours to a few days. A countertop-only removal can be done in part of a day, while a full gut to studs and subfloor with tile flooring takes longer.
Can you remove countertops without damaging the cabinets?
Yes. Countertops are released from inside the cabinet boxes and along the caulk lines, then lifted off in sections. There is always some risk with tops that were glued down heavily, and we will tell you at the walkthrough if we see that.
Do you disconnect the plumbing, gas, and appliances?
We shut water off at the fixture stops and disconnect standard appliances so they can be moved. Gas lines must be capped by a qualified trade, and permanent plumbing or electrical changes are done by licensed plumbers and electricians.
Do I need an asbestos survey before demolition starts?
In King and Snohomish counties, the Puget Sound Clean Air Agency requires an asbestos survey before renovation or demolition work begins. Materials such as popcorn ceiling texture, sheet vinyl, and old joint compound are common suspects in older Seattle-area homes. BRD Demolition does not perform asbestos abatement. If the survey finds asbestos in the work area, a certified abatement contractor removes it first and BRD Demolition handles the remaining demolition.
Do I need a permit for kitchen demolition?
Removing cabinets, countertops, and finishes on its own generally does not require a building permit, but the remodel that follows often does once plumbing, electrical, or walls change. Permit rules are set by your city or county, so check with your local permit office or your general contractor before work starts.
Job photos
Kitchen demolitionon site.
Photos from BRD Demolition jobs across King and Snohomish counties.

Get in touch / 07
Ready to discuss
your demolition project?
Thinking about demoing part of your home, or have a question about a project? Give BRD a call and we can help you get it done the right way.
Contact us today




